Access Control
How to install the access control system
1. Installation of front -end equipment such as the card reading area and power box
The operator first installs the card reading equipment at the entrance to ensure that there will be no strong magnetic fields within the scope of the card reading induction, such as monitor, heavy carrier, etc., and then set control
The box and power box, the control box should be installed in the weak electric well environment to facilitate the maintenance of the access control system in the future. Next, set the outbone button and electromagnetic lock outside the door frame.
2. Control device installation
The operator first installed the control keyboard and host of the prohibited system on the wall, and then set the alarm device. In addition, the access control system should be uninterrupted as the power supply is uninterrupted.
Industry personnel should use UPS power supply for centralized power supply.
3. Line installation
my country has released the construction and acceptance specifications of electrical installation projects. The operators should carry out system wiring according to this specification. In order to ensure that the work does not interfere with each other, the access control system
The pipelines should not be set in the same pipe as other system lines. The connector of the line is best set in the wiring box. The number of line turns is best more than five.
Use the insulation with the package. When the line passes through the deformation gap, the two ends should be fixed and left excess wires.
4. Installation and debugging
After the access control system is installed, the operators must conduct relevant debugging to determine the problem of no loopholes in the system. The operator connects the sensor to the host.
There is no problem with the access control sensor, and then the other line is detected until all lines are detected.