Three points of inspection must be done before installation of the Vertical Tripod Turnstile
Three points of inspection must be done before installation of the Vertical Tripod Turnstile
Intelligent three-roller gate manufacturers talk about the three necessary inspections for the installation of automatic tripod turnstile gates. Automatic tripod turnstile gates are widely used three-roller gates in the market, but the most common mistakes are made when implementing automatic three-roller gates. It is precisely the most. The three-roller gate manufacturer summarizes three inspections: motor inspection, system inspection and wiring inspection.
1. Motor inspection
Before the installation of the automatic three-roller gate, the no-load current of the motor should be <500mA, and the automatic three-roller gate can be installed only after the start button distance of the motor meets the requirements.
2. System check
Three-roll gate manufacturers must check the equipment before powering on the automatic three-roll gate system to ensure that the mechanical parts are not stuck and operate flexibly.
3. Check the wiring
According to the wiring diagram of the automatic three-roller gate, the manufacturer of the three-roller gate can check the wiring of the motor and the mains connection. After confirming that it is correct, the automatic three-roller gate can be powered on for debugging!